The hubs and I have been hoping that this week would be a full and productive one at the house.  We stopped by last night and saw that a few things had gotten accomplished.
The temporary, support posts that were up in the living area were taken down, leaving only the permanent beam in place.
|  | 
| View from front door area. | 
|  | 
| View from fireplace. | 
|  | 
| View from dining room. | 
The sub-floor was laid and the tub walls were framed out in the main bathroom.
|  | 
| View into main bath from the hallway.  Tub wall to the left has been framed and sub-floor has been laid. | 
|  | 
| Tub/shower area has been framed. | 
|  | 
| No more holes in the floor to the garage below. | 
The hole that existed on the backside of our house because of removing the old master bath window was closed up and covered with new cedar shake shingles.
|  | 
| No more plywood covered hole in the house.  Brand new cedar shake shingles. | 
The hubs and I are supposed to meet with our contractor and electrician tonight.  Let's hope this meeting does not get cancelled last minute like last week!