As I mentioned in
yesterday's post, I totally forgot to take pictures at the house when we met with our electrician. So here are the pictures that I should have taken two days ago. Our master closets are completely framed in and have a real floor now! {Please forgive me for the horrible lighting in my pictures. The days are growing short and we barely have any light sources in our house!}
|
Ready for the framing inspection...and we even have floors! |
|
My closet area. |
|
The hub's closet area. |
|
New hardwood floors carried throughout the space. |
We also had two out of three basement windows replaced.
|
Not sure what those wires are doing, running through the window frame, but *hopefully* our super electrician will resolve that! |
|
Much better than what existed before. |
Yesterday, our contractor started to install the hardwood in the kitchen, and he began patching the hallway, as well. Plus, we passed our framing inspection! So far, so good!
|
Definitely the right decision to carry the hardwood flooring through the kitchen. |
|
Halfway done. |
|
Old fridge sitting in our dining room. |
|
Patching the hardwood floors in the hallway. |
|
Another view of our red oak flooring getting installed. |
Hopefully the hubs and I can see the floors 100% complete when we get to the house after work. I really can't wait to see how everything looks when the floors get refinished and stained a different color!